| Customer is relocating their pitch asphalt manufacturing to another location. Customer requested that GW Construction, Inc. relocate the tanks, repair the tank shells and install new nozzles to API 653 standards, install new internal heat coils, install the new hot oil heater, fabricate, erect and install all the pipe lanes. |
 |
| Some photographs of the tank repair work performed on these tanks can be seen on the API 653 tank repair link of this web site. |
 |
Photo 1 After the tanks have been relocated, repaired, new nozzles and internal coils installed, fabrication and erection of the pipe lane begins. |
 |
Photo 2 The pipe lane structures as they appeared near completion. The extensions in the foreground will serve as rail loading facilities. |
 |
Photo 3 The installation of the new hot oil heater. This unit will provide the heat for the tank coils and hot oil tracers on the product lines. |
 |
Photo 4 Product and hot oil lines being installed in the pipe lane. |
 |
Photo 5 Pumps are installed and piping connected to the appropriate lines. |
 |
Photo 6 Piping construction from the pipe headers to the tanks. |
 |
| Construction of this project is on-going as this web site is being published. Please check back in the future to see the project as it appeared upon completion. |
 |